Concept Design | Schematic Design | Design Development | Construction Administration | Installation | Production
The centerpiece of the Centennial Olympic Park at the 1996 Summer Olympic Games in Atlanta was constructed in less than 6 months.
Using a combination of stock decking and custom designed demountable tensile structures, the Olympic Village provided a place for athletes and the public to interact. At Night, the exterior was covered with projected images that enhanced the public concerts performed on the pavilion stage.